Contact

Lincoln
INSULATION & ASBESTOS SERVICES
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ
FABRICATION
Crofton Drive, Allenby Industrial Estate, Lincoln LN3 4NJ
SCAFFOLDING
Greetwell Road, Lincoln, Lincolnshire LN3 4NH

London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Northampton
7 Edgemead Close, Round Spinney, Northampton, Northants, NN3 8RG

Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Manchester
Unit D21 Fieldhouse Industrial Estate, Fieldhouse Road, Rochdale, OL12 0AA

SCAFFOLDING

Infrastructure, construction &
industrial scaffolding services.

ASBESTOS

Asbestos testing, removal &
management services.

INSULATION

Industrial thermal insulation &
cladding services.

FABRICATION

Metal fabrication services &
industrial painting.


Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Warning: Invalid argument supplied for foreach() in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-fabrication.php on line 22

Fabrication Case Studies


Warning: Missing argument 2 for get_terms_dropdown(), called in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-fabrication.php on line 51 and defined in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-fabrication.php on line 33

Notice: Undefined variable: args in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-fabrication.php on line 34

UNDERBASE FOR OFFSHORE TURBINE

Project: Underbase for Offshore Turbine Final Location: Pegaga Gas Field Development, Malaysia Timescale: – July/August 2019 Rilmac Fabrication...

BESPOKE REPLACEMENT STAIRCASES

Project: Bespoke Replacement Staircases Client: TRAD Safety Systems Quantity: Two initially, potential for more Materials: Mild Steel Finish:...

SCREEN SYSTEMS INCLINE SCREEN UNITS

Project: Incline Screen Units Client: Screen Systems Quantity: Three Use: Municipal solid/liquid waste Destination: Hong Kong Water screen supply...

PROOF LOAD TESTING

Project: Proof Load Testing Industry: Energy Sector Proof Load Weight: 16 tonnes Final Load: Turbine Engines As part of a contract to fabricate two...

Ducting for Heat Recovery System

Project: Ducting for Heat Recovery System Client: HRS – Heat Recovery Solutions Materials: Mild Steel Quantity: One complete set Finish:...

MULTI USE GEARBOX / ENGINE REMOVAL TOOL FOR A GAS TURBINE

Project: Multi Use Gearbox / Engine Removal Tool For A Gas Turbine Client: Centrax Industries Materials: S275JR & S355JR Timescale: 12 weeks...