Client: Parker Plant
Project: Rustler 12
Scale: 8.357m x 17.557m x 3.571m
Materials: Mild Steel
Destination: USA
Number Required: 4
End Use: Road building
One of the largest projects Rilmac Fabrication have completed for Parker Plant. The Rustler 12 was built as a series of components, painted with primer, completed on the trailer chassis with the tractor unit coupling up and driven from the workshop to Leicester. Designed and built to work with ready-mix producers and allowing for better truck utilisation with a highly mobile, self-erecting remote concrete batch plant. The plant can be configured to suit most ready-mix applications with numerous aggregate and cement storage options.
Request a Quote
Contact Numbers
Rilmac Fabrication
Crofton Drive, Allenby Industrial Estate, Lincoln LN3 4NJ
Tel: +44 (0)1522 576535
Fax: +44 (0)1522 576582
Rilmac Holdings LTD
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ
Tel: 01522 531711
Fax: 01522 510291
What Our Clients Say
""Rilmac undertook a complete scaffold erection and dismantle for our Project at Poplar Farm Primary School in Grantham. From pre-start to delivery, James and the team undertook the works with great pace and working within a safe and secure manner. A true credit and testament to the values that Rilmac ascertain. The team were extremely helpful and worked with all other trades to ensure that works were erected within the correct manner and accounting for all factors that were put onto the team.
I can only personally thank James and the Team for the great work that was undertaken at Poplar Farm and it would be an extreme pleasure to work with them again.""