British Steel

Rilmac provide a full time based maintenance insulation team on the British Steel Scunthorpe site, comprising of two to three Thermal Insulation Engineers.

Company: British Steel (formerly TATA)

Location: Scunthorpe

Duration: 15 Years

BRITISH STEEL MAINTENANCE CONTRACT
Rilmac provide a full time based maintenance insulation team on the British Steel Scunthorpe site, comprising of two to three Thermal Insulation Engineers. The main activity is the removal of existing insulation in either of the two steam raising power stations and the replacement of the insulation on completion of mechanical maintenance of the equipment. The type of work is mainly boiler header pipework, vessels and turbine steam chests. This maintenance team are also used across the site in the ironmaking, steelmaking and rolling mills.

Feedback From British Steel:

Why did you require thermal insulation?

“Within the two power stations steam is raised to a maximum of 480°c so thermal efficiency and safety are the main reasons. Elsewhere frost protection, thermal efficiency and safety are the main priorities for insulation.”

Can you please write a short statement on our performance in dealing with your enquiry?

“The contract is placed for a period of two years, with the option of extending, depending on agreements in the contract value. During the negotiations for the contract, Rilmac provide a comprehensive scope of work and schedule of rates, which we are more than happy to meet and discuss, with prompt in replies to any queries raised.”

How you feel that our onsite team performed their work?

“The onsite Thermal Insulation Engineers are well experienced in working on the British Steel Scunthorpe site and are mostly self-managed. The work order is passed to them via a British Steel contract owner engineer and for the most part they contact the requesting area, agree the scope of work, measure, order material, provide a basic risk assessment/method statement and submit a day work sheet for approval at the end of the work. The response out of hours working is mainly met by the onsite team or provided for by other resources by the management team. The Rilmac management team meet on a weekly basis with British Steel engineers and regularly attend the monthly departmental safety meeting. Rilmac demonstrate a high level of flexibility and can react to most situations as they arise.”

How do you, as the customer benefit, from our works?

“The contract provides a service of insulation removal and refitting that runs parallel to the maintenance activities on the site. For most parts this is well managed with few interruptions to plant operations.” 

Call us on 01522 781436 or
Request a Quote


Contact Numbers

Rilmac Insulation - Lincoln
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ

Tel: 01522 781437
Fax: 01522 510291

Rilmac Insulation - London
5 Cecil Court, Pegrams Road, Harlow, CM18 7QR

Tel: 0800 612 9002

Rilmac Insulation - Leicester
Unit 2 No. 5 Knights Close Thurmaston Leicester LE4 8EW

Tel: 0800 612 9002

Rilmac Insulation - Manchester
Unit 27 Caldershaw Centre, Rochdale, OL12 7LQ

Tel: 0800 612 9002

Rilmac Insulation - Nottingham
Stapleford Road Trowell Nottingham NG9 3RP United Kingdom

Rilmac Insulation - Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Tel: 0800 612 9002

Rilmac Holdings LTD
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ

Tel: 01522 531711
Fax: 01522 510291

What Our Clients Say

"I would like to say a huge thank you to each and every one of you for all your hard work over the past 12 months. We have had a huge task and successfully hit all our targets on time with a fantastic safety record and good numbers with the NHBC.
We have also had great scores with the Considerate Constructors again winning an award in March and now in the running for another award this coming March. We have completed on 61 plots this year, mainly apartments which has been a very challenging build with penthouses that have driven us crazy with the designs, but we got there.
Again thank you and on behalf of myself and the team."

Gareth Wilkes - Project Manager
Kier Living