Covent Garden Flower Market

Thermal insulation of associated Low Temperature Hot Water, Cold Water and Chilled Water pipework throughout the new Covent Garden Flower Market.

Company: Neville Tucker
Location: London
Sector:  Heating and ventilation pipework
Duration: 3 Months
Approximate Value: £100,000
Rilmac Insulation Limited completed the thermal insulation of associated Low Temperature Hot Water, Cold Water and Chilled Water pipework throughout the new Covent Garden Flower Market, London. Hundreds of metres of various sized pipe work were insulated internally, this included individual metred units and communal areas. Pipework on roof levels were insulated and weatherproofed with a modern Ventureclad finish. Within the upper level units, ventilation ducts were also insulated. All pipework with plantroom areas were clad with aluminium sheeting and all valves, flanges, etc. insulated with purpose made removable insulation jackets to a high standard ensuring a professional look. Overall the project was a success and Neville Tucker were very happy with the quality of the work completed.
Call us on 01522 781436 or
Request a Quote


Contact Numbers

Rilmac Insulation - Manchester
Unit D21 Fieldhouse Industrial Estate, Fieldhouse Road, Rochdale, OL12 0AA

Tel: 0800 612 9002

Rilmac Insulation - Lincoln
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ

Tel: 01522 781437
Fax: 01522 510291

Rilmac Insulation - London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Tel: 0800 612 9002

Rilmac Insulation - Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Tel: 0800 612 9002

Rilmac Insulation - Northampton
7 Edgemead Close, Round Spinney, Northampton, Northants, NN3 8RG

Rilmac Holdings LTD
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ

Tel: 01522 531711
Fax: 01522 510291

What Our Clients Say

"Rilmac were very responsive throughout the pricing, design and erection phases of the build, which helped the smooth running of this multi million pound project to completion. I will look forward to working with them in the future."

Paul Williamson - Senior Project Manager
Kier Construction