Contact

Lincoln
INSULATION & ASBESTOS SERVICES
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ
FABRICATION
Crofton Drive, Allenby Industrial Estate, Lincoln LN3 4NJ
SCAFFOLDING
Greetwell Road, Lincoln, Lincolnshire LN3 4NH

London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Northampton
7 Edgemead Close, Round Spinney, Northampton, Northants, NN3 8RG

Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Manchester
Unit D21 Fieldhouse Industrial Estate, Fieldhouse Road, Rochdale, OL12 0AA

SCAFFOLDING

Infrastructure, construction &
industrial scaffolding services.

ASBESTOS

Asbestos testing, removal &
management services.

INSULATION

Industrial thermal insulation &
cladding services.

FABRICATION

Metal fabrication services &
industrial painting.


Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Warning: Invalid argument supplied for foreach() in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 22

Case Studies


Warning: Missing argument 2 for get_terms_dropdown(), called in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 51 and defined in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 33

Notice: Undefined variable: args in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 34

DAEDALUS MESS RAF CRANWELL

Project: New roofing on Daedalus Mess, RAF Cranwell Client: Jennings Roofing Location: RAF Cranwell Commenced: October 2018 Rilmac Scaffolding are...

VALENTINES COURT

Project: Student Accommodation Client: Lindum Construction Timescale: Nine months Location: Lincoln University As part of the expansion of Lincoln...

LONG MELFORD HOUSING DEVELOPMENT

Project: Housing Development Client: Kier Housing Location: Long Melford, Sudbury Timescale: In excess of 12 months The new housing development built...

DISUSED MILL ASBESTOS REMOVAL

Project: Disused Mill Asbestos Removal Location: Preston Lancashire Timescale: Four Weeks Operations Manager: Nick Coughlan Supervisor: Dan Noone...

YAVNEH SCHOOL

Project: New School Block Client: Bowmer & Kirkland Location: Borehamwood, London Timescale: Six Months Rilmac Scaffolding were contracted by...

EVERARDS BREWERY

Project: New café and cycle centre Client: Kier Construction Location: Leicester Timescale: 16 months approx. Rilmac Scaffolding were contracted by...