RAIL LINE BRIDGE PROJECT CASE STUDY

Project: Lincoln Bypass Market Rasen Rail Line

Client: Galliford Try

Value: £120 million (full LEBP project)

Timescale: Two years on the full scheme

As part of involvement across the whole Lincoln Bypass project Rilmac Scaffolding were required to provide abutment access during bridge installation.

Rilmac had already provided scaffold access during the concrete pour phases of the bridge abutments either side of the Market Rasen rail line.

The next phase of work was the installation of the four steel bridge sections which was planned over a 12-hour night shift period with appropriate Network Rail line closures.

Rilmac scaffolders were on hand during the night shift to provide access routes on to the newly positioned bridge sections and to allow for the uncoupling of the crane slings.

Photos kindly provided by Michael Kheng ‘The Drone Man’ https://thedroneman.net/

Call us on 01522 545680 or
Request a Quote


Contact Numbers

Rilmac Scaffolding - Lincoln
Greetwell Road, Lincoln, Lincolnshire LN3 4NH

Tel: 01522 545680
Fax: 01522 516530

Rilmac Scaffolding - London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Rilmac Scaffolding - Nottingham
Stapleford Road Trowell Nottingham NG9 3RP United Kingdom

Tel: 01604 659 788

Rilmac Scaffolding - Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Rilmac Holdings LTD
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ

Tel: 01522 531711
Fax: 01522 510291

What Our Clients Say

"Great job on the clamp system! Fitted perfectly, we were more than happy with them."

Rob Legate
FreeWatt